Operating costs of office buildings can be radically reduced
Just in the most critical period, the solar system operating on the buildings of the real estate development and management company Alfa Group radically reduced the operating costs of the tenants. Properly sized parks mean annual savings of tens of millions and predictable operating costs, while also radically reducing the building’s ecological footprint.
The biggest problem with home solar systems (HMKE) is that they do not produce when the energy is needed. Between production and use, the energy is either “stored” in the network, which makes the investor very vulnerable to the legal environment and the network operator, or they build their own battery capacity, which in turn raises the price of the projects to uneconomical heights – pointed out Ohad Epschtein, with real estate investment head of the Alfa Group.
On the other hand, in office or commercial properties, everything is “in place”, i.e. the demand that occurs almost exclusively from morning to afternoon and, according to experience, hardly fluctuates within a month or so, roughly coincides with the production period. A properly sized solar panel system can cover the needs of the office building almost continuously from spring to autumn, the amount of energy taken from the grid is just as minimal as the surplus produced.
Related news
Logistics facilities are stable against the waves of the real estate market
On the housing market, the demand for newly built real…
Read more >Related news
An all-around convincing performance by this year’s EuroCIS
This year’s EuroCIS – the leading trade fair for the…
Read more >Beyond Meat expands into Co-op in the UK
Beyond Meat’s plant-based alternatives are now available in 800 Co-op…
Read more >Sweden’s Essity Invests In New Research And Development Centre
Swedish hygiene products maker Essity is investing in a new…
Read more >