Slaughterhouse in Mohács: trial operation to start at the end of November
The “Giga Slaughterhouse” of the Pick Szeged Zrt. in Mohács is in delay – agrarszektor.hu-wrote.
According to the original planm, trial operation should have been start in October, but under the present circumstances, this can only take place at the very end of November. The delay was caused by works on the final phase of construction. (agrarszektor.hu)
Related news
Cattle slaughterings down by more than 10 percent
39.8 thousand cattle were slaughtered in the first half of…
Read more >Signature 40 once again – Signature Platform takes things to the next level: Signature Alumni Club launched
This article is available for reading in Trade magazin 2024/11…
Read more >Mizo orange-chocolate flavoured milk drink for November cold
Our new limited edition Mizo orange-chocolate flavoured milk drink has…
Read more >Related news
The Joy of Giving! – SPAR stores collect non-perishable food for people in need
The Hungarian Maltese Charity Service and SPAR Hungary have launched…
Read more >Price increase at Magyar Posta: this is how much the most common postal services will cost in 2025
Magyar Posta’s goal remains to provide its services efficiently and…
Read more >Nébih: LPP Hungary Kft. has recalled a ceramic bowl with a reindeer motif
The SINSAY brand ceramic bowl with a reindeer motif is…
Read more >