The biogas plant in Szarvas handed over today
The country's largest and most advanced biogas plant handed over today in Szarvas. The project costs about 4.5 billion HUF, of which 500 million came from EU funding.
The facility is a 4.17 MW power plant consists of four gas engines, which will produce an annual 27.6 million kw / hours by burning methane from agricultural and food waste. This is the entire energy consumption of a city with a population of 18-20 thousand. The investor is the first Aufwind Schmack First Biogas Ltd., which is 100 percent owned by the German Aufwind – reports Világgazdaság Online.
Related news
Related news
Location becomes a competitive factor in e-commerce
As digitalisation and consumer expectations evolve rapidly, logistics and warehousing…
Read more >Gyermelyi is strengthening in exports – adapting to the challenges
Based on the 2024 financial report of Gyermelyi Zrt., it…
Read more >Voluntary Water Donor Program Launches in Budapest
10 million Trees, the Budapest Municipality, the Főkert and the…
Read more >